Solved: Write a description explaining to Chase Opportunity what a successful project

Write a description explaining to Chase Opportunity what a successful project looks like. In other words, how will Chase know when you have achieved the common goal you set out to achieve? Describe three metrics, or measures, that you will use throughout the project life cycle. Explain how each metric relates to the project.

**below is extra information to help with the questions above:

The Scenario. Chase Opportunity has selected you as the project manager to oversee their latest project – Chase Retail Complex. Chase’s vision is to build four (4) 10,000 square foot buildings (see concept drawing below). Within each building, suite sizes may vary per customer rental agreement (estimating five (5) 2,000 square foot areas per building). Chase has the funds to cover the total project costs and they have already purchased the land for construction. Chase wants to start construction January 2, 2007 and complete the project as soon as possible.

Develop a work breakdown structure (WBS) and a responsibility matrix like those found in your text. You may use MS Word or Excel to develop both of these charts. (A chart and matrix are required.)

The following work activities should be included in your charts. Look them over and determine the best sequence in which they should be accomplished. Some activities (WBS Level 1) may be performed simultaneously whereas others may not. Using your personal knowledge and research, include at least two (2) sub-activities/sub-levels (WBS Level 2) for each activity. Use each of the two (2) names listed under Support Responsibility as a “Primary” for one of your sub-activities/sub-levels and as “Support” for the other sub-activity/sub-level. The WBS and matrix for Activity “Roof” may look something like these examples.

Primary                        Support

Activity                                    Responsibility             Responsibility

Roof                                                Jack                      Steve, Wally

HVAC                                              Bill                       Scott, Trevor

Landscaping                                    John                       Lynn, Beth

Paving                                             Greg                         Jeff, Pat

Plumbing                                         Max                     Tyler, Damian

Grading and Site Prep                      Sal                           Jim, Joe

Interior Structure                             Don                     Keith, Andrea

Foundation Construction               Randy                     Mark, Mike

Exterior Structure                            Bob                         Dan, Ken

Electrical                                          Seth                         Neil, Roy

Part C        Prepare a WBS and Gantt Chart in MS Project using the information developed in Part B and the information given. Then explain how much time the overall project is going to take to complete as is.

1.   It takes 30 days (standard 8-hour workdays, Monday through Friday) to complete each activity.

2.   Construct the WBS and Gantt Chart (in Project) illustrating the construction of each building in sequence. For example, building “A” must be built (completed) before construction on building “B” is started, etc. DO NOT include the Level 2 tasks in your Gantt Chart created in Part B.

Part D        Incorporate the following information into your WBS from Part C.

The project manager is paid $30/hour and each primary (P) worker is paid $25/hour while support (S) workers are paid $15/hour.

1.   Determine the project’s total labor costs. Explain your results. Submit a copy of your Resource Sheet.

2.   When developing the project cost plan, what things should be considered to estimate the total project costs? It may be helpful to contact actual contractors, construction companies, vendors, etc., for the tasks involved in this type of project.

Part E        In Part C, your WBS and Gantt Charts were based on each of the buildings being constructed one after the other. We know that building in this manner is a large waste of resources, namely people and time. Revise your original WBS and Gantt charts to reflect better use of your resources. In addition, submit a copy of your new Resource Sheet. Explain the changes you made, why you made them, and how these changes affect your overall project (i.e., costs, project duration, etc.).

Expert Answer

Answer:-

Gantt Chart for Building-A is given in below snapshot similarly for other Buildings can be done:-

While going sequential for 4 buildings and plotting on Gantt Chart all activities one after another, it takes 309 days per building and would require 309×4 = 1236 days but if gone parallel for activities than around 2 years.

Project Cost Calculation:-

Project Cost Plan need to take estimate of material and tool requirement. While resource outsourcing will reduce cost but quality could be compromised as contractor may deliver on time but may not deliver with good quality for his profiteering.

The project labor cost would remain same for all building, hence even going parallel work same timeframe would require and cost for each building would be same