Solved: There are two products being produced by a firm with the following bills of material

min ite Problem 1·There are two products being produced by a firm with the following bills of material: P (2) Q3) S(2) Routing Information (all times in hours) Product/ Lot Size Work Operation Setup Run Time SetupTotal hours Per Unit per partTime Part Center 20 100 1 of 1 40 100 1 of 1 100 200 of 1 70 300 1 of 1 50 200 1 of 2 50 300 2 of2 100 200 1of 2 100 300 2 of 2 0.6 0.8 0.8 1.2 0.4 .03 1.6 0.8 1.2 0.5 02 1.22 004 404 0.7 .029 .729 .032 .532 1.3 .016 816 0.6 012 1.212 0.9 .005 905 0.5 With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Week Product C Product D 50 40 20 45 18 Week 1 Week 2 Week 3 Work CenterC 30 Fill in the Work Center Load in the table above.
There are two products being produced by a firm with the following bills of material: Routing Information (all times in hours) With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Fill in the Work Center Load in the table above.

Expert Answer

Solved: There are two products being produced by a firm with the following bills of material 1

Don't use plagiarized sources. Get Your Custom Essay on
Solved: There are two products being produced by a firm with the following bills of material
GET AN ESSAY WRITTEN FOR YOU FROM AS LOW AS $13/PAGE
Order Essay
Still stressed from student homework?
Get quality assistance from academic writers!