Expert Answer
The MRP Schedule: (Assume the items will be produced in same week in which they are ordered)
Item: C
OH = 0
LT = 0
SS = 0
Q = 20
1
2
3
Gross Req.
50
40
45
Scheduled receipts
0
0
0
Projected-on-hand
10
10
5
Net Requirement
50
30
35
Planned order Receipts
60
40
40
Planned order releases
60
40
40
Time/unit on WC #100
0.83
0.83
0.83
Load on WC #100
49.8
33.2
33.2
Time/unit on WC #200
0
0
0
Load on WC #200
0
0
0
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: P (1 per item C)
OH = 0
LT = 0
SS = 0
Q = 100
1
2
3
Gross Req.
60
40
40
Scheduled receipts
0
0
0
Projected-on-hand
40
0
60
Net Requirement
60
0
40
Planned order Receipts
100
0
100
Planned order releases
100
0
100
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0.404
0.404
0.404
Load on WC #200
40.4
0
40.4
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: Q (3 per item C)
OH = 0
LT = 0
SS = 0
Q = 70
1
2
3
Gross Req.
180
120
120
Scheduled receipts
0
0
0
Projected-on-hand
30
50
0
Net Requirement
180
90
70
Planned order Receipts
210
140
70
Planned order releases
210
140
70
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0
0
0
Load on WC #200
0
0
0
Time/unit on WC #300
0.729
0.729
0.729
Load on WC #300
153.09
102.06
51.03
Total Load on WC #100
49.8
33.2
33.2
Total Load on WC #200
40.4
0
40.4
Total Load on WC #200
153.09
102.06
51.03
Item: D
OH = 0
LT = 0
SS = 0
Q = 40
1
2
3
Gross Req.
15
20
18
Scheduled receipts
0
0
0
Projected-on-hand
25
5
27
Net Requirement
15
0
13
Planned order Receipts
40
0
40
Planned order releases
40
0
40
Time/unit on WC #100
1.22
1.22
1.22
Load on WC #100
48.8
0
48.8
Time/unit on WC #200
0
0
0
Load on WC #200
0
0
0
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: P (2 per item D)
OH = 0
LT = 0
SS = 0
Q = 100
1
2
3
Gross Req.
80
0
80
Scheduled receipts
0
0
0
Projected-on-hand
20
20
40
Net Requirement
80
0
60
Planned order Receipts
100
0
100
Planned order releases
100
0
100
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0.404
0.404
0.404
Load on WC #200
40.4
0
40.4
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: R (1 per item D)
OH = 0
LT = 0
SS = 0
Q = 50
1
2
3
Gross Req.
40
0
40
Scheduled receipts
0
0
0
Projected-on-hand
10
10
20
Net Requirement
40
0
30
Planned order Receipts
50
0
50
Planned order releases
50
0
50
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0.532
0.532
0.532
Load on WC #200
26.6
0
26.6
Time/unit on WC #300
0.816
0.816
0.816
Load on WC #300
40.8
0
40.8
Item: S (2 per item R)
OH = 0
LT = 0
SS = 0
Q = 100
1
2
3
Gross Req.
100
0
100
Scheduled receipts
0
0
0
Projected-on-hand
0
0
0
Net Requirement
100
0
100
Planned order Receipts
100
0
100
Planned order releases
100
0
100
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
1.212
1.212
1.212
Load on WC #200
121.2
0
121.2
Time/unit on WC #300
0.905
0.905
0.905
Load on WC #300
90.5
0
90.5
Load on WC #100
48.8
0
48.8
Load on WC #200
188.2
0
188.2
Load on WC #300
131.3
0
131.3
Load on WC #100
48.8
0
48.8
Load on WC #200
188.2
0
188.2
Load on WC #300
131.3
0
131.3
Week 1
Week 2
Week 3
C
D
C
D
C
D
Total Load on WC #100
49.8
48.8
33.2
0
33.2
48.8
Total Load on WC #200
40.4
188.2
0
0
40.4
188.2
Total Load on WC #300
153.09
131.3
102.06
0
51.03
131.3