Solved: As the production planner for Xiangling Hu Products, Inc., you have been given a bill

As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item Number 1 Item Bracket - ISpring1) IlHousing(2) Ill Casting 2) IV | Base Shaf,1) Clamp(3) Clamp(2) Handlea)III BearingIVHandle)Casting2)
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item Number 1 Item Bracket – ISpring1) IlHousing(2) Ill Casting 2) IV | Base Shaf,1) Clamp(3) Clamp(2) Handlea)III BearingIVHandle)Casting2)

Expert Answer

Total number of Brackets required = 150

Inventory at hand ( for all items ) = 0

Since each unit of bracket requires 1 unit of Base, number of Base required = 1 x 150 = 150 units

Since each unit of Bracket requires 1 unit of spring, number of Springs required = 1 x 150 = 150 units

Requirement for Clamps:

Since each unit of Base requires 2 units of Clamp, number of clamps required for 150 units of Base = 2 x 150 = 300 units

Since each unit of Bracket requires 3 units of Clamp, number of clamps required for 150 units of Bracket = 3 x 150 = 450 units

Therefore , total number of clamps required = 300 + 450 = 750 units

Since 2 units of Housing is required for 1 unit of Base , number of Housing required for 150 units of Base = 2 x 150 = 300 units

1 unit of Handle is required against 1 unit of Clamp, Therefore total number of Handles required for 750 units Clamp = 750 units of Handle

Since 2 units of Casting is required against each unit of Clamp, total number of Castings required against 750 units of Clamp = 2 x 750 = 1500 units

Since 2 units of Bearing is required against each unit of Housing, total number of Bearings required for 300 units of Housing = 2 x 300 = 600 units

Since 1 unit of shaft is required against each unit of Housing , number of shafts which will be required for 300 units of Housing = 1 x 300 = 300 units

ITEM REQUIREMENT ( NUMBERS)
Base 150
Spring 150
Clamp 750
Housing 300
Handle 750
Casting 1500
Bearing 600
Shaft 300