value 0.00 points The following information is from the materials requisitions and time tickets for Job 9-1005 completed by Wright Boats. The requisitions are identified by code numbers starting with the letter Q and the time tickets start with W. At the start of the year, management estimated that overhead cost would equal 140% of direct labor cost for each job Date Document Amount 7/1/2011 Q-4698 $1,350 700 7/5/2011 Q-4725 1100 550 400 7/1/2011 W-3393 7/5/2011 W-3479 7/10/2011 W-3559 Determine the total cost on the job cost sheet for Job 9-1005. (Omit the “$” sign in your response.) Total cost
Expert Answer
As multiple questions have been asked, only one cn be answered at a time. | ||||||
1 | ||||||
Materials | 2450 | |||||
Labor | 1650 | |||||
Overhead | 2310 | |||||
Total cost | 6410 |