Question & Answer: Engel Appliances has developed a new European-style convection oven that will be made on an assembly…..

Refer to Scenario 1. What is the total idle time per cycle for this entire assembly operation? Scenario 1 Engel Appliances has developed a new European-style convection oven that will be made on an assembly line. The schedule requires 120 ovens in an 8-hour day. The assembly includes seven tasks. The table below indicates the performance time and the sequence requirements for each task Task Performance Time Task must follow Task listed below The cycle time per oven for this assembly operation is 40 minutesloven The precedence diagram is shown below. It shows that the actual number of workstations is 5 along with the specific tasks assigned to the workstations WS workstation W5 4 WS 5 WS 3 Minimized View 2 minutes 1 minute 4 minutes 0 minutes

Engel Appliances has developed a new European-style convection oven that will be made on an assembly line. The schedule requires 120 ovens in an 8-hour day The assembly includes seven tasks. The table below indicates the performance time and the sequence. requirements for each task. The cycle time per oven for this assembly operation is: 4.0 minutes/oven. The precedence diagram is shown below. It shows that the actual number of workstations is 5 along with the specific tasks assigned to the workstation. WS = workstation.

Expert Answer

Answer

Still stressed from student homework?
Get quality assistance from academic writers!