Buffalo Co. purchased land as a factory site for $576,000. The process of tearing down two old buildings on the site and constructing the factory required 6 months.
The company paid $60,480 to raze the old buildings and sold salvaged lumber and brick for $9,072. Legal fees of $2,664 were paid for title investigation and drawing the purchase contract. Buffalo paid $3,168 to an engineering firm for a land survey, and $97,920 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insurance on the property cost $2,160, and a liability insurance premium paid during construction was $1,296. The contractor’s charge for construction was $3,945,600. The company paid the contractor in two installments: $1,728,000 at the end of 3 months and $2,217,600 upon completion. Interest costs of $244,800 were incurred to finance the construction.
Determine the cost of the land and the cost of the building as they should be recorded on the books of Buffalo Co. Assume that the land survey was for the building.
Cost of the Land | $![]() |
|
Cost of the Building | $![]() |
Expert Answer
Land | Building | |
Purchase of land | 576000 | |
Razing of building | 60480 | |
sale of salvage | (9072) | |
legal fees | 2,664 | |
land survey | 3168 | |
Drawing | 97,920 | |
Title insurance | 2160 | |
liability insurance premium paid during construction | 1296 | |
construction cost | 3945600 | |
Interest | 244,800 | |
Total cost | 632,232 | 4,292,784 |