Given the following operations and unit times in minutes (#1 = 1.5, #2 = 3, #3 = 1, #4 = 2, #5 = 4), balance the production line with the goal of producing 30 units/hr.
Expert Answer
The maximum operation time is 4 minutes of operation 5. This sets the cycle time.
Line balancing to meet the demand as per minimum possible cycle time is as follows