Answered! Given the following operations and unit times in minutes (#1 = 1.5, #2 = 3, #3 = 1, #4 = 2, #5 = 4), balance the production line with the goal of producing 30 units/hr….


2) Given the following operations and unit times in minutes (#1 1.5, #2 3, #3 1, #4 2, #5-4), balance the production line with the goal of producing 30 units/hr.

Given the following operations and unit times in minutes (#1 = 1.5, #2 = 3, #3 = 1, #4 = 2, #5 = 4), balance the production line with the goal of producing 30 units/hr.

Expert Answer

 The maximum operation time is 4 minutes of operation 5. This sets the cycle time.

Line balancing to meet the demand as per minimum possible cycle time is as follows