Boeing 787 Dreamliner

CASE 5-2 – Boeing 787 Dreamliner – Pages 122-123 The first Boeing 787 Dreamliner was delivered to Japan’ s ANA in the third quarter of 2011, more than three years after the initial planned delivery date. It’s complicated, unique design (including a one‐piece fuselage that eliminated the need for 1,500 aluminum sheets and 50,000 fasteners and reduced the resulting weight of the plane proportionally) promised both a reduction in out‐of‐service maintenance time and a 20% increase in fuel economy, but problems with early testing of the new design contributed to the giant project’ s troubles. Even after those delays, the 787 was grounded in January 2013 because the main battery had problems of overheating and subsequently burning. The problems were finally reported solved in December 2014. Delivery of Boeing’ s 787 Dreamliner project was delayed, in part, because of the company’ s global supply chain net-work, which was touted to reduce cost and development time. In reality, the network turned out to be a major cause for problems. Boeing decided to change the rules of the way large passenger aircraft were developed through its Dreamliner program; rather than simply relying on technological know‐how, it decided to use collaboration as a competitive tool embed-ded in a new global supply chain process. With the Dreamliner project, Boeing not only attempted to create a new aircraft through the innovative design and new material but also radically changed the production process. It built an incredibly complex supply chain involving over 50 partners scattered in 103 locations all over the world. The goal was to reduce both the financial risks involved in a $10 billion‐plus project for designing and developing a new aircraft and the new product development cycle time. Boeing tapped the expertise of various firms in different areas such as composite materials, aerodynamics, and IT infrastructure to create a network in which partners’ skills complement each other. This changed the basis of competition to skill set rather than the traditional basis of low cost. In addition, this was the first time Boeing had outsourced the production on the two most critical parts of the plane—the wings and the fuselage. The first sign of problems showed up just six months into the trial production. Engineers discovered unexpected bubbles in the skin of the fuselage during baking of the composite material. This delayed the project a month. Boeing officials insisted that they could make up the time and all things were under control. But next to fail was the test version of the nose section. This time, a problem was found in the software programs, which were designed by various manufacturers. They failed to communicate with each other, leading to a breakdown in the integrated supply chain. Then problems popped up in the integration of electronics. The Dreamliner program entered the danger zone when Boeing declared that it was having trouble getting enough permanent titanium fasteners to hold together various parts of the aircraft. The global supply network did not integrate well for Boeing and left it highly dependent on a few suppliers. The battery problems involved lithium‐ion batteries that could not recover from a situation involving a rare but serious internal short circuit that would cause flames to spread from one cell to another. Lithium‐ion batteries had not previously been used in an airplane and had not been tested under an assumption of a short circuit. This case clearly underscores the hazards in relying on an extensive supply chain, failing to expect the worst case with critical new parts, and encountering information exchange problems that caused long delays and seriously compromised a company’ s ability to carry out business as planned. Creating a radically different process can mean encountering unexpected problems. In some cases, it would put a company so far behind its competition that it was doomed to fail. However, in this case, the major competitor to the Dreamliner, the Airbus 380 program, was also using a global supply chain model, and its program was delayed by a couple of years. The result for Boeing was a much‐anticipated plane with fuel economy and out-standing design that made the wait worth it. However, because of compromises in design, the Dreamliner holds only up to 250 passengers, compared to the A380, which has a seating capacity between 525 and 853. Discussion Questions:

1. Why did Boeing adopt the radical change approach for designing and developing the 787 Dreamliner? What were the risks? In your opinion, was it a good move? Defend your choice.

Don't use plagiarized sources. Get Your Custom Essay on
Boeing 787 Dreamliner
GET AN ESSAY WRITTEN FOR YOU FROM AS LOW AS $13/PAGE
Order Essay

2. Using the silo perspective versus business process perspective, analyze the Dreamliner program.

3. What are your conclusions about the design of the integrated supply chain? Give some specific ideas about what could have been done to integrate it better.

4. Using the silo perspective versus business process perspective, analyze the Dreamliner program. For more Information on  Boeing 787 Dreamline  check on this: https://en.wikipedia.org/wiki/Virgin_Atlantic

 

 

Grand Paper Writers
Order NOW For A 10% Discount!
Pages (550 words)
Approximate price: -

Our Advantages

Plagiarism Free Papers

All papers are written by the best professional writers to ensure 100% originality. We always provide plagiarism reports whenever we deliver completed papers.

Free Revisions

All papers by Grand Paper Writers are completed and submitted on time. This timely delivery of papers gives you time to go through the paper before the official deadline.

Title-page

As an additional service, we will provide a title page that precedes the contents of your paper. Here, you will provide your personal details.

Bibliography

We also ensure that we provide an extra page for the references or bibliographies following referencing rules.

Originality & Security

At Grandpaperwriters.com, we guarantee students for the provision of security and original work. All your personal information is handled with confidentiality and is not shared with third parties. Additionally, we ensure that we provide original content with accompanying plagiarism reports to show originality.

24/7 Customer Support

Our customer support team is always available 24/7 to provide instant responses to any queries raised by students.

Try it now!

Calculate the price of your order

We'll send you the first draft for approval by at
Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

Grandpaperwriters.com has the best professional essay writers for quality services.

Pricing

Flexible Pricing

Here, a Grandpaperwriters.com, we do not compromise on the time of our clients. We always deliver all completed papers on or before the deadlines.

Communication

Admission Help & Client-Writer Contact

Grandpaperwriters.com provides an interactive portal where students can communicate directly to their writers.

Deadlines

Paper Submission

Here, a Grandpaperwriters.com, we do not compromise on the time of our clients. We always deliver all completed papers on or before the deadlines.

Reviews

Customer Feedback

Grandpaperwriters.com appreciates feedback from our clients to help us improve the delivery of essay writing services. As such, we are constantly changing our policies to ensure maximum customer and writer satisfaction.